The Lahore Development Authority (LDA) has decided to dismantle the city’s first bike lane pilot project on Ferozepur Road after it caused more problems than solutions. The project was initially introduced to create safer, dedicated space for motorcyclists, running between Kalma Chowk and Lahore Bridge. However, instead of easing the flow of traffic, the lanes increased congestion, forcing the LDA to step back from the experiment.
Officials confirmed that sections of the curb-stone dividers have already been removed, while the rest of the stretch will be cleared within a week. Although the painted bike symbols on the road will remain for now, the physical structure of the bike lane will no longer exist.
Lahore Set for Dubai-Style Elevated Expressway to Tackle Congestion
The bike lane was seen as a bold urban planning step when it was first launched. Lahore is a city where motorcycles make up a large share of daily traffic, and dedicated lanes were expected to improve safety and reduce accidents. However, in practice, the reduced space for cars, buses, and trucks created bottlenecks. Traffic flow slowed down significantly, especially during peak hours, leading to frustration among commuters.
Urban experts say that while the idea was promising, it lacked proper planning and traffic studies. The lane design restricted the movement of larger vehicles and failed to consider Lahore’s high traffic volume. As a result, the LDA decided that removing the lane was the only solution to restore smoother movement on Ferozepur Road.
The short-lived experiment highlights the challenges of urban transport planning in Pakistan’s major cities. While innovative solutions are needed to handle growing traffic pressure, they must be carefully tested and adapted to local realities.
For now, the removal of the bike lane means motorcyclists will continue to share space with other vehicles. Still, many hope that future projects will better balance safety, efficiency, and traffic needs in Lahore.
FAQs
1. Why did the LDA remove the bike lane on Ferozepur Road?
Because it worsened traffic congestion instead of improving the flow.
2. Where was the bike lane located?
Between Kalma Chowk and Lahore Bridge on Ferozepur Road.
3. What will happen to the bike lane symbols?
The painted bike symbols will remain for now, but the dividers are being removed.
4. How long will it take to remove the entire lane?
Officials expect the full removal to be completed within a week.
5. What does this mean for motorcyclists?
They will continue to share regular lanes with other vehicles until a better plan is introduced.









